High-performance enterprise infrastructure does not always require buying a small number of expensive new systems. This project used seven refurbished HPE ProLiant DL380 Gen10 servers for the compute cluster and added redundancy at the network and firewall layers, turning the available budget into a maintainable and expandable architecture designed to withstand individual component failures.

2026-08-30 · Server Plus

HPE DL380 Gen10Refurbished serverEnterprise HAHigh-availability clusterCisco NexusCisco vPCFortiGate 200GVirtualization cluster

Server Plus deployed seven refurbished HPE ProLiant DL380 Gen10 servers with Cisco Nexus N9K-C93180YC vPC and a FortiGate FG-200G HA pair, creating an enterprise cluster with more than 5TB of memory.

Project Objective: Build an Enterprise Cluster That Can Keep Operating Within Budget

The customer needed to run many virtual machines, enterprise applications, and high-load workloads. Increasing the specification of one server was not the actual objective. The environment needed enough reserve capacity to keep critical services running when one device required maintenance or suffered a hardware failure.

Server Plus therefore allocated the budget across compute nodes, the core network, and the security perimeter. Tested refurbished enterprise equipment was used to establish redundancy from Server HA and Network HA through Firewall HA.

Compute Configuration: Seven HPE ProLiant DL380 Gen10 Servers

The compute layer consists of seven HPE ProLiant DL380 Gen10 servers. Each node is configured with two Intel Xeon Gold 6248 processors, 768GB of memory, and eight 1.92TB Enterprise SSDs, providing memory-dense compute and enterprise flash storage.

The cluster contains 5,376GB of memory in total, exceeding 5TB. Actual usable compute and storage capacity still depends on the hypervisor, reserved cluster capacity, RAID, data-protection policy, and workload allocation; raw hardware totals should not be treated as usable capacity.

  • Servers: 7 × HPE ProLiant DL380 Gen10
  • Processors: 2 × Intel Xeon Gold 6248 per server
  • Memory: 768GB per server, 5,376GB in total
  • Storage: 8 × 1.92TB Enterprise SSD per server

Compute HA: Maintenance of One Node Should Not Stop the Entire Service

Seven nodes share the workloads so that the remaining nodes can take over virtual machines and applications when one server has a hardware failure or enters scheduled maintenance. The actual fault tolerance depends on reserved cluster resources, failover policy, storage architecture, and application design. Before production, the six remaining nodes must be verified to have enough capacity for critical workloads.

High availability is not complete simply because more servers are installed. Node consistency, firmware, drivers, network adapters, storage paths, time synchronization, management networking, and failover testing all determine whether the cluster can take over correctly during an incident.

Network HA: Cisco Nexus N9K-C93180YC and vPC

The core network uses Cisco Nexus N9K-C93180YC switches with vPC for switch and link redundancy. Servers can connect to both Nexus switches through a Port Channel, reducing the risk that one switch, one uplink, or a maintenance operation interrupts network access.

vPC improves Layer 2 link availability, but peer-link, peer-keepalive, VLAN consistency, LACP, STP boundaries, upstream routing, and failure domains still require correct design. Switch restart, link failure, and single-side maintenance scenarios must be tested after configuration.

Security HA: FortiGate FG-200G Firewall Pair

External services and inter-zone traffic are protected by a Fortinet FortiGate FG-200G HA pair. The dual-appliance design prevents one firewall from becoming a single point of failure while providing policy enforcement, network segmentation, and perimeter security controls.

Firewall HA also requires validation of session synchronization, interface monitoring, HA heartbeat, routing, switch connectivity, and upstream circuits. A successful appliance failover does not guarantee that every application is unaffected; important services must be tested with real traffic to measure failover time and connection impact.

The Value of Refurbished Equipment: Converting Budget into Complete Redundancy

The value of refurbished equipment is not limited to a lower unit price. The same budget can fund more compute nodes, reserve capacity, core switches, firewalls, network adapters, optics, and maintenance resources. For an organization that needs HA, architectural completeness is often more important than the peak performance of one latest-generation server.

Refurbished deployment still needs clear testing and delivery standards. Server Plus verifies physical condition, hardware health, firmware, memory, storage, interfaces, power supplies, compatibility, and burn-in results, then explains warranty and delivery terms for the actual items supplied.

Server Plus Enterprise Infrastructure Services

Server Plus supplies more than servers and components. We help customers confirm that the selected equipment can form a complete, deployable system. Capacity planning, model selection, network and firewall design, installation, testing, cutover, and maintenance should all be based on real workloads and failure scenarios.

  • Enterprise refurbished server planning and supply
  • Virtualization, cluster, and HA deployment
  • Cisco Nexus and vPC network design
  • FortiGate firewall and HA implementation
  • Memory, storage, network adapter, and performance planning
  • System deployment, validation, and technical services

FAQ

Do seven servers automatically allow one node to fail?

No. Sufficient CPU, memory, storage, and network capacity must be reserved, and cluster failover must be configured correctly. Before production, verify that the remaining nodes can carry critical workloads with one node offline.

Are refurbished servers suitable for production environments?

Yes, when sourcing, testing, configuration, compatibility, warranty, and spare-parts strategy are clear. In a virtualization cluster, multiple nodes and redundancy can also reduce the effect of one hardware failure.

Does Cisco vPC make the entire network highly available?

No. vPC addresses part of Layer 2 switch and link redundancy. Upstream routing, VLANs, peer-link, power, fiber paths, and failure domains still need to be designed and tested.

Is FortiGate HA failover always interruption-free?

Not necessarily. Session synchronization, operating mode, routing, interfaces, and application protocols affect the result. Validate failover with actual service traffic.