01
High cost for new platforms
A single new enterprise server can cost over a million NTD. The same budget can provide more refurbished nodes for resilience and expansion.

SERVER PLUS ENTERPRISE IT
Tested HPE, Dell, Cisco, and Fortinet equipment for HA, capacity expansion, and replacement deployments.
1,000+
Equipment delivered
3-7 天
Typical dispatch
1-36 個月
Warranty by item
SUPPORTED BRANDS
ENTERPRISE HARDWARE PROCUREMENT
For small and midsize businesses, server procurement is a balance of budget, lead time, HA resilience, and actual performance requirements.
NT$2M
Typical budget for two new HA servers
2+ months
Typical new-server lead time
7-8 units
Refurbished nodes assessable within a comparable budget
01
A single new enterprise server can cost over a million NTD. The same budget can provide more refurbished nodes for resilience and expansion.
02
New hardware lead times commonly start at two months, making expansion and replacement schedules difficult to control.
03
Funding only the minimum number of systems leaves too little room for fault tolerance.
04
File services, backup, ERP, virtualization, and internal systems often value stability and maintainability over the newest generation.
INVENTORY AND SERVICES
We confirm configuration, test status, and warranty terms against deliverable inventory before procurement.
01
HPE ProLiant and Dell PowerEdge enterprise platforms.
Get inventory and pricing02
Access, aggregation, and core network equipment.
Get inventory and pricing03
FortiGate enterprise perimeter security appliances.
Get inventory and pricing04
NAS, drives, SSDs, memory, RAID, NICs, and power supplies.
Get inventory and pricing05
Static IP, international bandwidth, BGP/static routing, and Anti-DDoS access.
Get inventory and pricing06
Assessment and recovery of retired servers, network, and data-center equipment.
Get inventory and pricingSERVICE ADVANTAGES
Hardware inspection, firmware checks, stress testing, and quality sign-off before shipment.
1-36 month warranty options by product and a defined fault-handling process.
CPU, memory, storage, and network are aligned to workload and budget.
Deliverable inventory is the basis for quotation; typical shipment is 3-7 business days.
INSIGHTS
HPE DL325 Gen10 Plus
2026-09-18
Server Plus has received four refurbished HPE ProLiant DL325 Gen10 Plus servers with AMD EPYC 7702P 64-core/128-thread CPUs, 512GB DDR4 ECC and P408i-a RAID, for virtualization, containers and enterprise compute planning.
Fortinet
2026-09-04
Server Plus has FortiGate FG-101F, FortiSwitch FS-448E-POE, and FortiAP FAP-231G-T in stock for an integrated firewall, PoE switching, and Wi-Fi 6E deployment. Individual and project purchases are available.
HPE DL380 Gen10
2026-08-30
Server Plus deployed seven refurbished HPE ProLiant DL380 Gen10 servers with Cisco Nexus N9K-C93180YC vPC and a FortiGate FG-200G HA pair, creating an enterprise cluster with more than 5TB of memory.
L3/L4 Anti-DDoS
2026-08-30
A practical explanation of how L3/L4 Anti-DDoS uses BGP, global Anycast, network-layer traffic scrubbing, and clean traffic delivery to mitigate UDP floods, SYN floods, reflection attacks, and upstream congestion.
Anti-DDoS plan
2026-08-30
Before buying Anti-DDoS, separate protection scale, clean bandwidth, delivery ports, 95th-percentile billing, BGP prefixes, session redundancy, attack reporting, and SLA instead of comparing only gigabits.
Dell Precision 3650
2026-08-29
Dell Precision 3650, HPE ProLiant ML350 Gen10 16Bay SFF, a Radiant system with RTX 4070 Ti, and HP Z1 Tower G6 are coming soon for enterprise office, virtualization, AI, CUDA, CAD, and media workloads.
FREQUENTLY ASKED QUESTIONS
Each delivered system follows a preparation process that includes hardware inspection, firmware updates, stress testing, and quality confirmation.
Savings depend on model, generation, CPU, memory, storage, and warranty, but refurbished enterprise systems can materially reduce acquisition cost.
Yes. CPU, memory, drive type and quantity, RAID, and NICs can be selected subject to compatible available components.
PROCUREMENT SUPPORT
Share the intended workload, budget, and core specifications. We will confirm stock, configuration options, test scope, and warranty terms.